Project 2 - Optimization

International Textile Company, Ltd., is a Hong Kong – based firm that distributes textiles worldwide. The company is owned by the Lao family. Present plans are to remain in Hong Kong through the transition in governments. Should the People’s Republic of China continue its economic renaissance, the company hopes to use its current base to expand operations to the mainland. International Textile has mills in the Bahamas, Hong Kong, Korea, Nigeria, and Venezuela, each weaving fabrics out of two or more raw fibers: cotton, polyester, and/ or silk. The mills service eight company distribution centers located near the customer’s geographical centers of activity.

Since transportation costs historically have been less than 10% of total expenses, management has paid little attention to extracting savings through judicious routing of shipments. Ching Lap is returning from United States, where he has just completed his bachelor’s degree in marketing. He believes that each year he can save International Textile hundreds of thousands of dollars – perhaps millions – just by better routing of fabrics from mills to distribution centers. One glaring example of poor routing is the current assignment of fabric output to the Mexico City distribution center from Nigeria instead of from Venezuela, less than a third the distance. Similarly, the Manila center now gets most of its textiles from Nigeria and Venezuela, although the mills in Hong Kong itself are much closer.

Of course, the cost of shipping a bolt of cloth does not depend on distance alone. Table 2.1 provides the actual costs supplied to Mr. Lao from company headquarters. Distribution center demands are seasonal, so a new shipment plan must be made each month. Table 2.2 provides the fabric requirements for the month of March. International Textile’s mills have varying capacities for producing the various types of cloth. Table 2.3 provides the quantities that apply during March.

Table 2.1 Shipping Cost Data (Dollars per bolt)

Distribution Center

Mill

Los Angeles

Chicago

London

Mexico City

Manila

Rome

Tokyo

New York

Bahamas

2

2

3

3

7

4

7

1

Hong Kong

6

7

8

10

2

9

4

8

Korea

5

6

8

11

4

9

1

7

Nigeria

14

12

6

9

11

7

5

10

Venezuela

4

3

5

1

9

6

11

4

 

Table 2.2 Fabric Demands for March (bolts)

Distribution Center

Fabric

Los Angeles

Chicago

London

Mexico City

Manila

Rome

Tokyo

New York

Cotton

500

800

900

900

800

100

200

700

Polyester

1,000

2,000

3,000

1,500

400

700

900

2,500

Silk

100

100

200

50

400

200

700

200

 

Table 2.3 March Production Capacities (bolts)

Production Capacity

Mill

Cotton

Polyester

Silk

Bahamas

1,000

3,000

0

Hong Kong

2,000

2,500

1,000

Korea

1,000

3,500

500

Nigeria

2,000

0

0

Venezuela

1,000

2,000

0

 

Table 2.4 Overtime Production Costs

Cost per Bolt

Mill

Cotton

Polyester

Silk

Bahamas

$10

$10

N.A.

Hong Kong

15

12

$25

Korea

5

8

22

Nigeria

6

N.A.

N.A.

Venezuela

7

6

N.A.

 

Your job for the Project

Mr. Lao wants to schedule production and shipments in such a way that the most costly customers are shorted when there is insufficient capacity and the least-efficient plants operate at less than full capacity when demand falls below maximum production capacity. You have been retained by International to assist Mr. Lao.

Questions:

  1. Find the optimal March shipment schedule and its total transportation cost for each of the following:

  2. The company will be opening a silk-making department in the Nigeria mill. Although it will not be completed for several months, a current capacity of 1,000 bolts for that fabric might be used during March for an added one-time cost of $2,000. Find the new optimal shipment schedule and the total cost for that fabric. Should the Nigeria mill process silk in March?

  3. Mr. Lao learns that changes might have to be made to the March plans. If a new customer is obtained, the cotton demand in Manila and in Mexico City will increase by 10% each. Meanwhile, a big New York customer might cut back, which would reduce polyester demand 10% in both New York and Chicago. Find the contingent optimal schedules and total costs (a) for cotton and (b) for polyester.

  4. International Textile loses a profit of $10 for each bolt of cotton if falls short of meeting the distribution center’s demand. For polyester, the loss is $20 per bolt; for silk, it is a whopping $50 per bolt. By running the mills on overtime, the company can produce additional bolts at the additional costs shown in Table 2.4. Using only the original data from Tables 2.1 – 2.3 and the Information in Table 2.4, determine new production schedules to maximize overall profit for successively (a) cotton, (b) polyester, and (c) silk. Which fabrics and locations involve overtime production, and what are the overtime quantities?

  5. Without making any calculations, offer Mr. Lao other suggestions for reducing costs of transportation.

 

Deliverables

Turn in the Word file of the report and the Excel Spreadsheet (especially the work using Solver), by uploading to iCollege. Your report must have a cover page with title, names of all the team members, and a distribution of points for each member based on participation. If each person contributes equally, each is to be allocated 100 points. If in a team of 3, one person does less and another covers up for him/her, the points may look like this 120,100, 80 (or some other combination that the team decides on). These are peer review points, and I will use those to adjust individual grades on the project.